logoCONSUCONSTRUCT

Construction Design Request

Owner Information

Financing

Ficohsa, BAC, Davivienda, Atlántida, etc.

Government funds administered by the bank

Land

Construction

HNL

Solo costo de construcción — sin terreno ni nivelación

El Acabado Medio es el estándar sugerido — incluye cielo falso LED, cerámica importada y mueble de cocina en concreto. Si tienes requerimientos específicos, selecciona el acabado que mejor se adapte a tu proyecto.

Ceramic tiles, paint, plaster, pedestal sink, kitchen sink, complete electrical installations (lighting, outlets, washer, dryer, heater), complete sanitary installations (toilet, sink, shower, kitchen sink, dishwasher hose installation, sink faucet), Aluzinc sheet gauge 26 channel 2x6.

HNL 12,000/m²

SUGERIDO

Everything from basic level plus: False ceiling installation, LED lighting installation, concrete kitchen cabinet.

HNL 13,000/m²

All of the above plus: Water reserve, breakfast bar, fully designed kitchen, glass doors, porcelain tile, facade stones, kitchen backsplash.

HNL 15,000/m²

Auto-calculado desde presupuesto

Auto-calculado desde presupuesto

(Write details on the side if applicable)

© CONSUCONSTRUCT 2026

¿Listo para construir?Solicita tu presupuesto
Empezar →
Solicitud de Diseño y Construcción | ConsuConstruct Honduras | ConsuConstruct